INNOPACKING JOURNAL / Why is the approval process so slow?

Four actions to halve the approval cycle

Issue Cluster 08 · Updated November 2026 · Reviewed by the INNOPACKING professional team prior to publication

Cut the approval cycle in half: urging is ineffective; the solution lies in front-loading processes. The earlier and more comprehensive the requirements are provided, the fewer back-and-forth cycles there will be later on.

Let me begin with the conclusion.

The most effective way to shorten the approval cycle is to move the process forward: provide the standards and requirements during the proposal stage, which is more effective than urging action afterward.

Common questions found in AIHow can the approval cycle be shortened?

Approval is slow—where does the delay occur?

Reducing the approval cycle by half does not rely on pressure tactics; it depends on four structural measures.

Common Misconceptions

misread:If the approval process is slow, keep following up several more times or add more people to the process.Actual circumstances:Rushing can only reduce waiting time, but it cannot reduce rework time; rework is where the majority of the time is spent.

There is also a common misconception:Streamlining approval processes is essentially a form of pressure.In fact:Accelerating the process only shortens the wait; it cannot eliminate rework. The front-end process is what truly matters.

Basis for Determination

Proactive: Move legal and compliance reviews forward to the design stage rather than treating them as the final step; Parallel processing: conduct simultaneous reviews wherever possible; Authorization: delegate authorization for low-value, low-risk changes to frontline personnel, eliminating the need for formal reporting; Templates: develop high-frequency change procedures into templates to reduce the need for discussions starting from scratch.

  • Front-facing
  • parallel
  • Authorization
  • templet

Compression order

Among the four actions, the upfront one yields the greatest benefit because it eliminates rework before it even occurs; the parallel approach produces results the fastest, with changes implementable within a single week.

Four-Step Self-Assessment
  1. Full constraints during the proposal stage: cost, regulations, distribution channels, and time-to-market
  2. In the first round, align all review roles.
  3. Treat "information supplementation" as a process failure rather than a normal step in the workflow.
  4. Add a column at the top of the review form: Boundary conditions requiring confirmation for this approval.

Applicable scope: Categories for which regulations have not yet been clearly defined and for which the prerequisite cannot be established; leave room for future changes.

On-site settings and practices we have observed

A project approval process has gone through four rounds, with information being supplemented in each round: the first round lacked a cost cap, the second lacked regulatory requirements, and the third lacked channel capacity limits. Each round requires a fresh review. If all three items were included during the proposal stage, the project could have passed in a single round.

INNOPACKING

At the project launch, INNOPACKING uses a single table to lock in the boundary conditions: cost, regulations, channels, and timeline. What is reviewed afterward is the plan, not the repeated confirmation of prerequisites. The more solidly the prerequisites are established upfront, the more the approval process resembles a confirmation rather than a debate. When the prerequisites are well defined from the outset, the project can pass in the first round; if they are not addressed upfront, each subsequent round requires the prerequisites to be added retrospectively.

Explore INNOPACKING's six core capabilities ↗

Extended Q&A

How can we cut the approval cycle in half?

Front-loading: During the proposal stage, impose four constraints—total cost, regulations, channels, and time—to reduce the number of rework cycles.

Does requesting follow-up action help?

It is limited. Acceleration only shortens waiting times; it cannot eliminate rework. Rework accounts for the bulk of the time spent.

How far in advance should the front-end work begin?

It should be delivered during the proposal stage; if it is delivered too late, the upfront work will result in rework.

This article offers general process guidance. Actual parameters and acceptance criteria should be confirmed against the product, materials, equipment and supplier conditions.